Strategic guidelines for sustainable improvement of project management
Abstract
The research was aimed at proposing guidelines for the management of infrastructure projects in the Physical Plant Division of the “Francisco de Miranda” National Experimental University. The research design was considered non-experimental, projective type, special project modality. Regarding the analysis of the data obtained, it was made up of results matrices and developed in a Pareto Diagram. The results obtained indicated that the project management process carried out in the Physical Plant Division corresponds to a traditional management based on the variable, dimensions and indicators that supported the research, in which it is required to focus efforts on a methodology that will allow numerous benefits, from the organizational point of view.
Downloads
References
Gaceta Universitaria de la U.N.E.F.M., Nº 79 (Resolución CU.002.986.098). (1998, I Trimestre).
Lewis, J. (2004). Las claves de la Gestión de Proyectos. España: Ediciones Gestión 2000.
Palacios, E. (2007). Gerencia de Proyectos. (Cuarta edición). Caracas: Impresos Miniprés, C.A.
Copyright (c) 2020 Arelys Marian López-Medina

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
CC BY-NC-SA : Esta licencia permite a los reutilizadores distribuir, remezclar, adaptar y construir sobre el material en cualquier medio o formato solo con fines no comerciales, y solo siempre y cuando se dé la atribución al creador. Si remezcla, adapta o construye sobre el material, debe licenciar el material modificado bajo términos idénticos.
URL de OAI-PMH: https://iieakoinonia.org/ojs3/index.php/gestioep/oai







